Changes between Version 2 and Version 3 of WeeklyMinutes20100304


Ignore:
Timestamp:
Mar 4, 2010, 3:43:21 PM (8 years ago)
Author:
jreed
Comment:

more from call

Legend:

Unmodified
Added
Removed
Modified
  • WeeklyMinutes20100304

    v2 v3  
    3636
    3737Shane sent that in email on Tuesday. See it for details.
     38https://lists.isc.org/pipermail/bind10-dev/2010-March/000568.html
    3839
    3940== Shane to update the review process so that if you want someone to look at it you are no longer the owner ==
     
    5455Michael working on class for TSIG signing. Hoping something done by Monday. Configuration. How to pass in keys. Signing is minor part.
    5556
    56 EDNS0 is basically finished by Jinmei.
     57EDNS0 is basically finished by Jinmei. Has DO bit. Initial code done. Needs more tests and doc is missing.
    5758
    5859Likun working on XFR. Discussion in emails. API how to select? Do we have a plan to .... for API for year 1? Transfer code in Python. No datasource code on Python side yet.
    5960
     61(Missed discussion here -- too much noise on phone.)
     62
     63Jelte to work on ...?
     64
    6065= Report from CeBIT (if possible) =
    6166
    62 -----
     67Shane and Jelte there. May get three articles about BIND 10.
     68
     69---------
     70
     71= Schedule =
     72
     73 - code needs reviewed
     74 - bug fixes that go along with that
     75 - code needs to be in a release branch
     76 - code needs to be in a release state
     77 - some development as we find out, emphasis is not on new features though
    6378
    6479= Licenses =
    6580
     81 - Jeremy wanted to talk about this but call was ended.
     82
    6683= Trunk restructure =
    6784
    68 -----
     85 - michael says so close, may cause disruption, so suggests do later.
     86
     87= Other =
    6988
    7089Larissa researching DimDim instead of WebEx.
     90
     91Datasource location not configurable yet. Jelte has code for that, not in trunk yet.
     92
     93Over at :42 after.